Copper-Gold Exploration · Northwestern Zambia
The Kafwego Project
A greenfield copper-gold exploration opportunity in northwestern Zambia with IOCG targeting logic, district-scale potential, and a phased path to value creation.
Commodity
Copper-Gold
Stage
Greenfield Exploration
Location
Northwestern Zambia
Tenure
108 km²
Exploration Model
IOCG Targeting Framework
Partnership Model
Phased Farm-in
Overview
Project Overview
Kafwego is a greenfield copper-gold exploration project located in northwestern Zambia. The project is being advanced on an IOCG-style exploration thesis supported by favorable structural setting, surface geochemical indications, and regional geological context within the Greater Lufilian Arc.
The project covers 108 km² and is designed to give partners staged exposure to discovery upside while preserving capital discipline through a milestone-based partnership structure.
Location
Location and Regional Context
The project sits in northwestern Zambia within a copper-endowed regional setting. District context supports ongoing exploration work, subject to stage-appropriate technical validation.
- Northwestern Zambia, Greater Lufilian Arc positioning
- Regional structural architecture supports IOCG targeting logic
- Zambia is a proven copper jurisdiction with established infrastructure and regulatory frameworks
- District context consistent with prospective exploration address
Placeholder guidance: Replace map with a verified layer showing project boundary, regional structural corridors, and relevant reference infrastructure once approved.
Placeholder: Geological interpretation and location map — showing project boundary, regional structural features, and district context. Northwestern Zambia / Greater Lufilian Arc.
Geology
Geological Setting
The exploration model is built on an integrated assessment of structural setting, lithological context, and surface geochemical signatures interpreted within an IOCG framework.
Structural setting
The project area sits within a structurally favorable setting interpreted to support fluid movement and mineral emplacement.
Lithological context
Regional host sequences and geological architecture are consistent with a fertile copper province.
IOCG rationale
The exploration model focuses on iron oxide copper-gold style mineralization based on available geological and geochemical indicators.
Exploration indicators
Surface geochemistry and regional signatures are suggestive of potential and support continued target refinement.
Technical indicators
Surface Results
Surface geochemistry provides early encouragement for continued work. These values are exploration-stage indicators and should not be read as resource statements.
Copper
Maximum at surface
Gold
Maximum at surface
Qualifier
Surface values provide early encouragement but are exploration-stage indicators. These figures do not represent a defined mineral resource under any reporting standard and should be interpreted accordingly.
Placeholder: Surface geochemistry figure — showing sample locations, copper and gold values, and spatial context relative to structural features and project boundary
Comparable context
District framework
The project is being explored within an IOCG framework that invites comparison at the level of geological concept, not equivalence. The Greater Lufilian Arc hosts several significant copper-cobalt systems, providing a credible district context for exploration-stage targeting.
Infrastructure
Development logic
Regional operating context and project staging are considered in technical planning. Zambia’s established copper sector provides relevant infrastructure and logistics precedent. Specific infrastructure details will be disclosed in verified technical materials as the project advances.
Work program
Next Work Program
The immediate technical agenda is focused on target maturation and preparation for a disciplined first drilling sequence.
01
Refine targets
02
Complete technical review
03
Prepare drilling program
04
Execute discovery drilling
05
Advance successful zones
Advance diligence through structured technical engagement
Request the investor brief or schedule a technical briefing to discuss the project and exploration thesis in detail.